|
|||||||||||||||||||||||||||||||||||||||||||||
|
Advertisement Detail Invitation to Bid St. Sebastian River Preserve State Park - Horseman's Headquarters Restroom Advertisement Number: BDC44-19/20 Version Number: 000 Advertisement Begin Date/Time: 05/21/2020 - 03:30 P.M. Advertisement End Date/Time: 06/11/2020 - 03:30 P.M. Mod: 05-21-2020 08:58:52 Last Edit: Thursday, May 21, 2020 at 08:59:15 A.M.
PROJECT NAME: St. Sebastian River Preserve State Park - Horseman’s Headquarters Restroom BID SUBMITTAL DUE DATE: No later than 3:30PM (ET), Thursday, June 11, 2020, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000, Attention Alyssa Skehan, Government Operations Consultant II, Bureau of Design and Construction, (850) 245-2781. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids. BID POSTING DATE: No later than 3:30PM (ET), Thursday, June 11, 2020, unless extended by the Department for good cause. INSTRUCTIONS: Documents for this bid will be available for download on May 21, 2020. Any firm desiring a Project Manual with the plans for this project may obtain directions by emailing BDC_Contracts@dep.state.fl.us
SCOPE OF WORK: Base Bid: Contractor shall provide all labor, materials, equipment, supervision and permitting to furnish and install a prefabricated vault restroom per the contract documents. Alternate #1: Contractor shall provide all labor, materials, equipment, supervision and permitting to perform the site work necessary for the installation of a prefabricated vault restroom per the contract documents. Under this alternate, FDEP will purchase and coordinate the delivery and installation of the prefabricated vault restroom. Builder’s Risk Insurance is required for this project and must be included in bid price. Note: Bidder Prequalification is required for all bids. Each bidder shall provide a copy of its biennial pre-qualification letter from FDEP’s Bureau of Design and Construction. If not pre-qualified, the bidder must submit a current State Contractor license certification or registration and current Corporate Charter registration with the bid. Pursuant to Executive Order 07-126 and Section 255.252(3), F.S. the Department requires the proposed project be designed and constructed in accordance with green building standards where applicable.
|
||||||||||||||||||||||||||||||||||||||||||||
|