Advertisement Detail Invitation to Bid Guana Tolomato Matanzas National Estuarine Research Reserve – Pole Barn Advertisement Number: BDC36-19/20 Version Number: 000 Advertisement Begin Date/Time: 04/02/2020 - 03:30 P.M. Advertisement End Date/Time: 04/22/2020 - 03:30 P.M. Mod: 04-02-2020 04:02:43 Last Edit: Thursday, April 2, 2020 at 04:03:15 P.M.
PROJECT NAME: Guana Tolomato Matanzas National Estuarine Research Reserve – Pole Barn BID SUBMITTAL DUE DATE: No later than 3:30PM (ET), Wednesday, April 22, 2020, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000, Attention Alyssa Skehan, Government Operations Consultant II, Bureau of Design and Construction, (850) 245-2781. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids. BID POSTING DATE: No later than 3:30PM (ET), Wednesday, April 29, 2020, unless extended by the Department for good cause. INSTRUCTIONS: Documents for this bid will be available for download on Thursday, April 2, 2020. Any firm desiring a Project Manual with the plans for this project may obtain directions by emailing BDC_Contracts@dep.state.fl.us
SCOPE OF WORK: Base Bid: Contractor shall provide all labor, materials, equipment, supervision and permitting to construct 3-bay pole barn per the contract documents. Builder’s Risk Insurance is required for this project and must be included in bid price. Note: Bidder Prequalification is required for all bids. Each bidder shall provide a copy of its biennial pre-qualification letter from FDEP’s Bureau of Design and Construction. If not pre-qualified, the bidder must submit a current State Contractor license certification or registration and current Corporate Charter registration with the bid. Pursuant to Executive Order 07-126 and Section 255.252(3), F.S. the Department requires the proposed project be designed and constructed in accordance with green building standards where applicable.
|
||||||||||||||||||||||||||||||||||||||||
|