Advertisement Detail Invitation to Bid Florida Caverns State Park – Rework Hickory Nut Drive Road Shoulders and Parking Areas Advertisement Number: BDC41-17/18 Version Number: 000 Advertisement Begin Date/Time: 06/14/2018 - 03:30 P.M. Advertisement End Date/Time: 07/13/2018 - 03:30 P.M. Mod: 06-14-2018 08:20:24 Last Edit: Thursday, June 14, 2018 at 08:21:01 A.M.
PROJECT NAME: Florida Caverns State Park – Rework Hickory Nut Drive Road Shoulders and Parking Areas BID SUBMITTAL DUE DATE: No later than 3:30 pm (ET), Friday, July 13, 2018, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000, Attention Adam Browne, Government Operations Consultant II, Bureau of Design and Construction, (850) 245-2466. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids. BID POSTING DATE: No later than 3:30 pm (ET), Friday, July 20, 2018, unless extended by the Department for good cause. INSTRUCTIONS: Documents for this bid will be available for download on June 14, 2018. Any firm desiring a Project Manual with the plans for this project may obtain directions by emailing BDC_Contracts@dep.state.fl.us
SCOPE OF WORK: Base Bid: The contractor shall provide all labor, materials, equipment and supervision to successfully rework the Hickory Nut Drive Road Shoulders, including the driveway aprons and mitered end sections of the existing cross drain, per the construction documents. Alternate #1: The contractor shall provide all labor, materials, equipment and supervision to successfully rework the Hickory Nut parking area per the contract documents. Alternate #2: The contractor shall provide all labor, materials, equipment and supervision to successfully rework the Sweet Gum Parking Area per the construction documents. Alternate #3: The contractor shall provide all labor, materials, equipment and supervision to successfully construct all guardrails (From Sta 61+00 to Sta 67+50). If this bid alternate is not awarded, contractor shall rework road shoulders as indicated in base bid. Installation Floater Insurance is required for this project and must be included in bid price.
|
||||||||||||||||||||||||||||||||||||||||||
|