Advertisement Detail Invitation to Bid Earl Gilbert City Park - Oakshore Drive Fishing Pier Advertisement Number: BDC14-21/22 Version Number: 004 Advertisement Begin Date/Time: 09/29/2021 - 03:30 P.M. Advertisement End Date/Time: 11/16/2021 - 03:30 P.M. Mod: 11-08-2021 11:33:37 Last Edit: Monday, November 8, 2021 at 11:34:03 A.M.
PROJECT NAME: Earl Gilbert City Park - Oakshore Drive Fishing Pier MANDATORY PRE-BID MEETING: Will be held at 10:00AM (CT), on Wednesday, October 6, 2021 at the Parker City Hall, 1001 W Park St, Panama City, FL 32404. Please contact Alyssa Skehan at (850) 245-2781, or by e-mail at Alyssa.Skehan@FloridaDEP.gov, to confirm your planned attendance. All bidders must be present and signed in prior to the start of the mandatory pre-bid meeting. Anyone not signed in at the commencement of the meeting will be considered late and will not be allowed to bid on the project. BID SUBMITTAL DUE DATE: No later than 3:30PM (ET), Tuesday, November 16, 2021, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000, Attention Alyssa Skehan, Government Operations Consultant II, Bureau of Design and Construction, (850) 245-2781. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids. BID POSTING DATE: No later than 3:30PM (ET), Tuesday, November 23, 2021, unless extended by the Department for good cause. INSTRUCTIONS: Documents for this bid will be available for download on Tuesday, September 28, 2021. Any firm desiring a Project Manual with the plans for this project may obtain directions by emailing BDC_Contracts@dep.state.fl.us
SCOPE OF WORK: Base Bid: Contractor shall provide all labor, materials, equipment, supervision and permitting to construct a 556 ft (468 ft. waterward) public fishing pier. Pier varies between 8 – 12 ft wide and consists of concrete piles and superstructure, with timber railing and decking. The pier also incorporates safety lighting and down lighting along with benches per the contract documents. Builder’s Risk and Longshoreman’s Insurance is required for this project and must be included in bid price. Note: Bidder Prequalification is required for all bids. Each bidder shall provide a copy of its biennial pre-qualification letter from FDEP’s Bureau of Design and Construction. If not pre-qualified, the bidder must submit a current State Contractor license certification or registration and current Corporate Charter registration with the bid. Pursuant to Executive Order 07-126 and Section 255.252(3), F.S. the Department requires the proposed project be designed and constructed in accordance with green building standards where applicable.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|