The applicant shall arrange with the building official to schedule the following inspections of the stormwater management system:
(1) Erosion and sediment control inspection. This inspection shall be conducted as deemed necessary by the city during and after construction to ensure effective control of erosion and sedimentation. Control measures shall be installed and stabilized between any waters and any areas proposed to be cleared prior to any land clearing activity.
(2) Bury inspections. This inspection shall be conducted when all work on the stormwater management system facilities has been completed. A record drawing of the system is required with sufficient information to show that the system is built in accordance with the approved site plan and construction drawings as certified by a registered state professional engineer. The inspecting official shall either approve the work or disapprove it, in which case he shall give written notification to the applicant indicating the nature of any deficiencies. Any portion of the work which does not comply shall be corrected by the permittee within the timeframe deemed reasonable by the city building official. Any failure to comply shall be subject to the penalty of section 90-120. A fee for inspections shall be as set forth in appendix B to this code.
Chapters 91--93 RESERVED
Chapter 94 SIGNS*
ARTICLE I. IN GENERAL